Hayman Cosntruction - Home
 

ENVIRONMENTAL

Colonel Talbot PS (London)

Elgin Water Supply
(near Port Stanley)

GM-Cami WWTP (Ingersoll)

Oxford St. PCP (London)

Wonderland Road
Pumping Station (London)

Delaware Standpipe Upgrades

 

 

 

 

 

 
 

 

South Edgeware Booster Station (St. Thomas)

 

 

July 2024 - New construction underway

 

 

July 2024 - Piling Installation

 

Location:

St. Thomas

Owner:

City of St. Thomas

Contract Type:

General Contractor

Engineer:

Arcadis

Value:

$14,300,000

Started:

June 2024

Completion:

July 2025

Description:

Water Booster Pumping Station, located next to the existing Elgin Middlesex Pumping Station (built by us in 1994).

 

Underground level will Include four 300 kW (400 hp) pumps and associated piping, valves, electrical, HVAC and SCADA controls.

 

 

Google Maps

Google Street View

Google Aerial 3D

Conceptual Drawing of Booster Station Addition

July 2024 - Existing Elgin Middlesex Pumping Station (built by us in 1994) with excavation for new construction underway at right

 

 

 

 

 
 
© Copyright 2024 Hayman Construction Inc. All Rights Reserved.
Web Design and Content Management by REM Web Solutions.

HOME PORTFOLIO PLANS ROOM REFERENCES  
ABOUT PROJECT LOCATIONS AFFILIATIONS CONTACT  


CLICK HERE TO LOGIN TO OUR DIGITAL PLANS ROOM
Hayman Construction Inc.
636 Wellington Street
London ON N6A 3R9

Tel: (519) 433-3966
Fax: (519) 433-8351

Estimating Department: [email protected]

General Inquiries: [email protected]

Accounting: [email protected]