Nearing completion
|
Pour #4 of 305 cm
(September 14, 2018)
|
July 12, 2018
|
Pour #4 of 305 cm concrete (September 14, 2018)
|
|
|
|
Location:
|
London
|
Owner:
|
Sifton Properties Limited
|
Contract Type:
|
Subcontract to Ellis Don Consttruction
|
Structural
Engineer:
|
VanBoxmeer and Stranges Ltd.
|
Value:
|
$5,435,000
|
Started:
|
April 2018
|
Completion:
|
February 2019
|
Description:
|
Concrete formwork package for a 4 floor parking garage (1 underground, 3 above ground) in Joint Venture wih Middlesex Concrete Forming, who constructed the formwork for the highrise portion of the project.
|
|