
April 19, 2018 - Final Pour

April 19, 2018 - Final Pour as seen from Tower Crane
|
Location:
|
Waterloo
|
Subcontract to:
|
Con-Wall Concrete (2016) Inc.
|
Consultant:
|
PG Design Studios
|
Value:
|
$680,000
|
Height:
|
6 levels above ground
|
Area:
|
Footprint: 663 sm / 7,140 sf
Total Area: 4,370 sm / 47,000 sf
|
Completion:
|
May 2018
|
Description:
|
Concrete formwork package for 6 level residential highrise in Waterloo, Ontario
|
 Architectural Rendering of New 6 Level Building
highlighted at lower left
.
|
|