Hayman Cosntruction - Home
 

 

 
 
BRIDGES

Thames Valley Parkway
(London)

Port Bruce (Port Bruce)

Hyde Park Road (London)

Gore Road (London)

Oxford St. (London)

Kilworth (Kilworth)

 

 

 

 
 
 

Port Bruce Bridge Replacement (Port Bruce)

South Side Entrance (looking North)

Centre of Bridge (looking South)

 

Site of Replacment Bridge and temporary bridge (built by others in 2018)

 

South Side - Installing 1st Girder (October 5, 2020)

South Side - November 20, 2020

 

 

 

Location:

Port Bruce

Owner:

Elgin County

Contract Type:

General Contractor

Engineer:

K Smart Associates

Value:

$5,090,000

Started:

February 2020

October 5, 2020 - North Side - 1st Girders Installed

Completed:

December 2020

Description:

New 2-lane vehicular bridge replacing previous bridge which collapsed in February 2018.

(See CBC News Story: Bridge collapses into flooded creek in Port Bruce, Ont. - A dump truck driver was stranded inside the cab of his vehicle when the bridge he was travelling over in Port Bruce, Ont., collapsed Friday into rushing flood waters...)

 

Google Maps View

 

Google Street Views

 

 

 

 

 

 
 
© Copyright 2024 Hayman Construction Inc. All Rights Reserved.
Web Design and Content Management by REM Web Solutions.

HOME PORTFOLIO PLANS ROOM REFERENCES  
ABOUT PROJECT LOCATIONS AFFILIATIONS CONTACT  


CLICK HERE TO LOGIN TO OUR DIGITAL PLANS ROOM
Hayman Construction Inc.
636 Wellington Street
London ON N6A 3R9

Tel: (519) 433-3966
Fax: (519) 433-8351

Estimating Department: [email protected]

General Inquiries: [email protected]

Accounting: [email protected]