
Before stair removal

After Stair Removal
Gallery of Additional Photos
|
Location:
|
London
|
Owner:
|
Greater London
International Airport Authority
|
Contract Type:
|
Design-Build
|
Value:
|
$741,000
|
Started:
|
August 2015
|
Completed:
|
December 2015
|
Description:
|
Interior renovations, including removal of existing enclosed stairway in ticketing area of terminal, and removal of existing revolving entrance/exit door.
|
Google Street View
|

|

|
New Departures Entrance - Before (left) and After (right)
|
 |
 |
|
Old Departures Entrance - Before (left) and After (right)
|
|
|
|